Essays.club - Получите бесплатные рефераты, курсовые работы и научные статьи
Поиск

Контрольная работа по "Иностранному языку"

Автор:   •  Ноябрь 24, 2022  •  Контрольная работа  •  667 Слов (3 Страниц)  •  157 Просмотры

Страница 1 из 3

Тема 1. Fact tools

Данилова Мария

Тезаурус

Nuclear energy – ядерная энергия, атомная энергия

Rumor – слух

Undisputed – бесспорный, неоспоримый  

Fan blade – лопасть вентилятора

Dual-use – двойного назначения, двойное использование  

Not liable  неподлежащий

Foreseeable future – обозримое будущее

Equally – в равной мере

Legal schemes – не запрещенный законодательством, имеющие юридическое значение

Controversy – спор, разногласия, дискуссия

Drastically – в значительной мере, радикальным образом

 

Таймлайн

When?

Who

In favor of

Actions

Pinpoint

1992

Several developed countries

Danubia

Helped Danubia to launch its own nuclear program (DNP) aimed at constructing and then exploiting two nuclear power plants that would cover up to 85% of Danubia’s energy demand.

Item 1

1992-2017

Several developed countries

Danubia

Actively supporting the DNP.

Item 2

October 2017

Danubia

The Union of Danubian Trozkists

Used an ongoing economic crisis to overthrow the elected Danubian government and establish their own political regime that proclaimed the world’s socialistic revolution as its final end.

Item 2

1 December 2021

Mr. Ribery

Shadow Import ltd

Sent an e-mail to offering to sign a Supply Agreement. A file was attached.

Item 8

5 December 2021

Big Metal Fan ltd

Big Metal Fan ltd

They sent a small e-mail without attachments.

Item 9

January 2022

Danubian President

Danubia

Start of the Danubian nuclear military program

Item 10

January 2022

The Carolingian Republic

The Carolingian Republic

Responded by imposing harsh unilateral economic restrictions on Danubia.

Item 11

April 2022

Big Metal Fan ltd

Big Metal Fan ltd

Notified Shadow Import ltd about its concerns and proposed to mutually terminate the Supply Agreement. Shadow Import ltd replied by insisting that the Supply Agreement must stay in effect and be duly performed.

Item 13

May 2022

Big Metal Fan ltd 

Shadow Import ltd

Big Metal Fan ltd did not start shipping.

Item 15

June 2022

Big Metal Fan ltd

Big Metal Fan ltd

Purchased 1 500 substitute fan blades from Small Metal Fan ltd with a surcharge of 50 USD per unit.

Item 16

June 2022

Big Metal Fan ltd

Big Metal Fan ltd

Initiated the present arbitral proceeding and claimed damages from Big Metal Fan ltd  for non-performance of its obligations under the Supply Agreement.

Item 16-17

...

Скачать:   txt (5 Kb)   pdf (91.8 Kb)   docx (11.7 Kb)  
Продолжить читать еще 2 страниц(ы) »
Доступно только на Essays.club